Board approves 50:50 JV with NALCO for 1080 MW captive thermal power plant
Board approved incorporating a 50:50 joint venture company with NALCO, proposed to be named NLC NALCO Power Limited.
- JV Capacity
- 1080 MW (4 X 270 MW) thermal captive power plant
- JV Structure
- 50:50 joint venture with NALCO
- JV Name
- NLC NALCO Power Limited
- Share Subscription
- Face value of Rs. 10/- each; NLC India to hold 50%
- Approvals Status
- DIPAM approval conveyed by Ministry of Coal; other statutory and administrative approvals pending
What was approved
The Board of Directors, at its meeting held on 29th September, 2026, considered and approved the incorporation of a Joint Venture Company with National Aluminium Company Limited (NALCO), with equity participation of the company and NALCO in the ratio 50:50.
The project
- Development of a 1080 MW (4 X 270 MW) Thermal Captive Power Plant, to be built in phases.
- Purpose: to meet the captive power requirements of NALCO.
- The JV will also explore options of a long term PPA for NALCO's renewable energy requirements.
The proposed entity
- Proposed name: NLC NALCO Power Limited, or any other name made available or approved by the Ministry of Corporate Affairs.
- To be incorporated in India.
- Industry: Thermal Power Generation.
- The listed entity will hold 50% of the shares of the proposed JV.
Consideration
- By way of subscription of equity shares of the proposed JV, in cash.
- Shares will be acquired at face value of Rs. 10/- each.
Approvals
- The Ministry of Coal, by its letter dated 8th September, 2026, conveyed the approval of DIPAM for the formation of the JV between the company and NALCO.
- The arrangement remains subject to various statutory and administrative approvals and to compliance with DIPAM guidelines as may be prescribed.
How to read this
This is a board-level approval to form a new company, not a completed incorporation or a commissioned plant. Capacity is planned to come up in phases and further approvals are pending, so timelines and capital outgo will depend on those steps. A captive plant tied to an identified off-taker such as NALCO gives the intended demand visibility for the power to be generated.
Also from NLC India
Director (Power) appointed: Shri P L S S Chaitanya Prakash assumes charge with effect from 05 October 2026
5 Oct 2026
NLC India Renewables, an arm of NLC India, won an SJVN tender to set up a battery energy storage system in Haryana
1 Oct 2026
Subsidiary Receives Letter of Award for 265 MW/530 MWh Battery Storage Project in Haryana
30 Sep 2026
More numbers
- JV equity participation ratio (NLC share)50:50
- Planned thermal captive power plant capacity1080 MW (4 X 270 MW)
- Face value per share subscribedRs. 10/- each
- Shareholding of listed entity in proposed JV50%
Nothing here is a view, opinion or recommendation of ScoutQuest, its parent, directors or employees. ScoutQuest is a technology company: this page was assembled automatically from public sources using artificial intelligence, and may contain errors or omissions. Confirm everything against the original source before you act on it. Any use of this page is at your own risk, and neither ScoutQuest nor its parent, directors or employees accepts liability for it.