ScoutQuest23 Oct 2026
Gufic Biosciences509079Inspection report

USFDA Pre-Approval Inspection at Indore facility concludes with 3 observations

USFDA carried out a Pre-Approval Inspection at the company's manufacturing facility at Pithampur, Indore, Madhya Pradesh.

By ScoutQuest · · 1 min read

Inspection Type
USFDA Pre-Approval Inspection
Inspection Period
October 15, 2026 to October 23, 2026
Observations
3(three) observations in Form FDA 483

What the company informed the exchanges

For a first-time reader

A Pre-Approval Inspection is an inspection the USFDA carries out in connection with a product approval application for a manufacturing site. Points noted during such an inspection are recorded in a form called Form FDA 483. The company has disclosed the number of observations, 3(three), and has said it will respond within the timeframe set for it.

What to watch

More numbers
  • Observations received in Form FDA 4833(three)
Source: BSE · 23 Oct 2026

Nothing here is a view, opinion or recommendation of ScoutQuest, its parent, directors or employees. ScoutQuest is a technology company: this page was assembled automatically from public sources using artificial intelligence, and may contain errors or omissions. Confirm everything against the original source before you act on it. Any use of this page is at your own risk, and neither ScoutQuest nor its parent, directors or employees accepts liability for it.

About ScoutQuest · Logos provided by Logo.dev