- Total tonnage managed
- ~1.28 million tonnes, higher YoY
- Processing volumes
- ~0.68 million tonnes, ~7.2% lower YoY
- Core revenue
- ~1% lower YoY; H1 core revenue growth ~3.8%
Quarter and half year ended September 30, 2026
Operational picture
- Total tonnage managed in Q2 FY27 was approximately 1.28 million tonnes, higher year on year despite an exceptionally heavy monsoon.
- Collection & Transportation (C&T) volumes rose about 11.5% year on year, helped by the ramp-up of the newly commenced C&T operations in Mumbai awarded by Brihanmumbai Municipal Corporation, and by higher volumes from existing operations including Navi Mumbai, Panvel and Noida.
- Processing volumes were about 0.68 million tonnes, roughly 7.2% lower year on year, mainly because energy operations at the Pimpri Chinchwad (PCMC) waste-to-energy facility remained suspended.
- The company said processing volumes would have grown after adjusting for the PCMC WtE facility, supported by higher volumes at the construction & demolition waste processing facility in Mumbai.
Revenue read
- Core revenue was about 1% lower year on year, as power sales from the PCMC plant were absent; C&T revenue growth largely offset this.
- For the first half of the fiscal year, core revenue growth was about 3.8%.
By-product sales
- RDF sold rose year on year, while compost sold was lower, reflecting seasonally subdued demand during the monsoon months and the disruption at the PCMC facility.
- No power was generated during the quarter, against about 14.0 million units in Q2 FY26.
PCMC WtE facility - incident and restoration
- On July 8, 2026, excessive and incessant monsoon rainfall caused a legacy waste landfill located adjacent to the facility, outside the company's operational perimeter, to collapse onto the site, causing severe structural damage and the loss of nine lives.
- Restoration is being done in close coordination with PCMC and the relevant authorities; all Original Equipment Manufacturers are working on inspection, repair and recommissioning of the affected equipment and systems.
- Based on current progress, the WtE facility is expected to be functional by December 2026.
- In the interim, Material Recovery Facility and composting operations at the site have resumed, and collection and transportation services continued uninterrupted across all project sites, including PCMC.
Support to bereaved families
- The company said it continues to honour in full the commitments disclosed earlier, including financial assistance, employment to the next of kin, educational support for minor children and medical coverage for the injured.
What to watch
- The restart of the PCMC WtE plant, expected by December 2026, and the company's plan to update on restoration at the end of every quarter through the current financial year.
Also from Antony Waste Handling Cell
Corporate guarantee extended for subsidiary's credit facilities up to ₹ 9,88,75,000
8 Oct 2026
Corporate Guarantee Extended to ICICI Bank for Subsidiary's Rs 34 Crore Credit Facilities
28 Sep 2026
More numbers
- Total tonnage managed in Q2 FY27~1.28 million tonnes
- C&T volume growth YoY~11.5%
- Processing volumes in Q2 FY27~0.68 million tonnes
- Processing volume change YoY~7.2% lower
- Core revenue change YoY~1% lower
- Core revenue growth in H1 FY27~ 3.8%
- Power generated in Q2 FY26 (nil in Q2 FY27)~14.0 million units
- Lives lost in the PCMC facility incidentnine lives
Source: BSE · 17 Oct 2026
Nothing here is a view, opinion or recommendation of ScoutQuest, its parent, directors or employees. ScoutQuest is a technology company: this page was assembled automatically from public sources using artificial intelligence, and may contain errors or omissions. Confirm everything against the original source before you act on it. Any use of this page is at your own risk, and neither ScoutQuest nor its parent, directors or employees accepts liability for it.